| Project Overview - Plant & Transmission Line |
|
Plant
-
Installed Capacity: 150 MW (75MWx2) and Small Turbine: 2.1MW for
Local consumption.
- Type of Turbine: Pelton
- Gross Head: 775.5 m
- Waterway: 3,540 m (Underground Pressure Tunnel)
|
|
|
- 230kVx2 circuits
(161km to Thai/Lao Border)
|
|
| |
|
|
|
|
|